Stewart lake Trail Bridge Project

November 16, 2015

 

All the materials have been donated for the bridges completion.

 

The Club is now seeking welder/fabricator to complete the construction of the frame and railings.

The Club will be setting funds aside to pay for the finishing fabrication work if required.

 

The hope is to have this finishedthis year so the bridge can be moved out to the trail for install duing winter/spring.

 

If you'd like to assist in the fabrication and welding please contact the club and we can get you in  touch with a director to explain what is still needed. 

Please reload

Featured Posts

Stewart Lake Trail (km26) Bridge Project

March 28, 2015

1/1
Please reload

Recent Posts
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic

Promoting recreational trail riding in the peace region

Promoting safety and environmental stewardship

Working with other local and regional user groups

Working with government to create and protect new and existing trails 

Moose Atv Club

Copyright 2003-2019